2017 November
We arrived in Shenzhen to check out the site of the project for the very first time.
The appointed contractor has already torn down all the non-structural walls.
1510762740
2017 November
We arrived in Shenzhen to check out the site of the project for the very first time.
The appointed contractor has already torn down all the non-structural walls.